# How much is a new home in Rolleston?

The three selected Rolleston house and land advertisements checked on 8 October 2026 were $747,500, $749,900 and $769,900. They show specific advertised packages, not Rolleston's cheapest home, a market average, or the cost of every new build. A section-only or build-only price is a different comparison.

Source: https://buynew.co.nz/blog/rolleston-new-builds-guide#prices. Advertisements checked 8 October 2026.

## Price examples

Three selected package advertisements covering two builders, drawn from the Broadfield Grange developer's package page and Oakridge Homes' stocklist. Prices are NZD. The sample is illustrative and does not measure market-wide prices. Confirm the complete written scope, GST treatment, payment structure and availability before relying on a package price.

### Lot 246, Broadfield Grange

$747,500 (Advertised house and land package). 4 bedrooms · 164 m² home · 500 m² section.

Provider: [Broadfield Grange / Today Homes](https://www.broadfieldgrange.nz/house-and-land-packages/lot-246).

The developer identifies Today Homes as the build partner. Confirm the specification, site works and what the advertised package includes with the builder.

### Lot 136, Arbor Green

$749,900 (Advertised house and land package). Bedroom count to confirm · 143 m² home · 390 m² section.

Provider: [Oakridge Homes](https://oakridgehomes.co.nz/stocklist).

The stocklist describes three bedrooms, while a separate supplier homepage listing differs. Confirm the bedroom count, current lot-specific sales pack and inclusions before relying on the layout.

### Lot 135, Arbor Green

$769,900 (Advertised house and land package). 4 bedrooms · 156 m² home · 390 m² section.

Provider: [Oakridge Homes](https://oakridgehomes.co.nz/stocklist).

The supplier stocklist records a four-bedroom home with two bathrooms and a double garage. Build timing is an estimate to confirm, not a guaranteed move-in date.

## Compare the full cost

### Land, build or both?

A section price covers land. A house-plan or build-only price can exclude land, site works and other costs. Compare a complete package only after checking its written scope.

### Compare payment structures

Progress payments and turnkey structures can have different payment timing and prices. Request the contract, allowances and exclusions before comparing two headline amounts.

### Price the finished home

Check foundations, drainage, utility connections, driveway, landscaping, fencing, heating, appliances and window coverings. Ask which costs are fixed and which may vary.

### Test the whole budget

Include deposits, borrowing costs, legal and valuation fees, rates, insurance, maintenance and any rent during construction. Confirm financing and completion conditions for your circumstances.

## Questions

### How much does a new Rolleston house and land package cost?

The three package examples recorded here on 8 October 2026 range from $747,500 to $769,900. They are a small selected sample, not a claim that all Rolleston packages fall within that range. Compare current listings and obtain a written quote for the exact home.

### Is a Rolleston section price the cost of a complete home?

No. A section-only price is for land. You must separately establish the build, site works, consents, connections, external finishes and other costs. A house and land advertisement still needs its written inclusions checked.

### Can I use the mortgage calculator for a house and land package?

You can model principal-and-interest repayments using a chosen home price, deposit, rate and term. The calculator does not model construction drawdowns, changing rates, fees or lending approval. Confirm the project's actual payment and finance structure with your lender and builder.

## Next step

[Estimate repayments](https://buynew.co.nz/mortgage-calculator). [Compare townhouses](https://buynew.co.nz/townhouses). [Compare house and land](https://buynew.co.nz/house-and-land).

General information only. Provider advertisements are not independent valuations or confirmations of stock. Confirm property, finance and contract details with the relevant professionals.
